Thanks Semisane! On the two kits I have built so far, LMF worked great. Its very easy to use and gives excellent results IMO. I did 6 applications on this kit. I would apply it before work, come home and card the parts and do another application. I averaged about 12 hours between applications. The biggest thing you need is humidity. Its pretty dry here so I built a tent using an "a-frame" type ladder and plastic sheeting for the barrel. I put the other parts in a plastic tub with a lid. I boiled water and put it in containers in the tent and tub to increase humidity. LMF has instructions on their site too.